Pinnacle Street
Oversaw the CC design process and coordinated the full consultant team. Secured Fire & Rescue and Sydney Water PCA approvals and owned every pre-construction matrix item through to construction start.
Design management and project management for apartment and mixed-use developments — from DA through CC to OC, with the compliance trail the DBP Act demands.
Developers consistently face the same three pressure points. Every package we run removes them with a single point of accountability across design and construction.
DA, CC and OC dates slip when the design program isn't owned — and every slipped week carries holding costs.
Consultants, the developer and the site team working from different assumptions — and finding out late.
Issues that surface on site instead of on paper, turning into cost blowouts, rework and program damage.
Full responsibility for DA approvals and consultant coordination.
Certifier-ready documentation, staged so construction never waits on paper.
A deep health check of every document before you commit to construction.
The developer's representative on the ground.
Engage a single package, combine them across the full DA-to-completion lifecycle, or replace the need for an internal design manager entirely. The model flexes to the project — not the other way around.
Oversaw the CC design process and coordinated the full consultant team. Secured Fire & Rescue and Sydney Water PCA approvals and owned every pre-construction matrix item through to construction start.
Delivery design and project management through CC and construction. Managed a Building Commissioner random audit — closed out with excellent feedback.
Managed the pre-construction matrix and led the design team to secure the CC approval — documentation, coordination and excavation initiation delivered on program.
Quality assurance and technical construction detail review across a mixed-use tower. Led the design team to building code compliance approval and delivered a Section 4.55 securing a 30% top-up under in-fill affordable housing provisions.
Design management across two residential flat buildings with basement parking, landscaping and bio-retention — from documentation through delivery coordination.
Design management for Buildings C & D within the Pelican Road subdivision — basement parking, landscaping and associated works coordinated across the full consultant team.
Tell us the site, the stage and the programme pressure. We come back with a scoped proposal and a fixed fee — within one business day. Prefer to talk first? Grab a free 30-minute intro call.
A free 30-minute call with the studio principal. Walk us through the project and leave with a clear next step — no obligation.